Wednesday 27 November 2013

Friday the Thirteenth

Artwork on display at Central St Martins
On Friday 13 December about 150 new docking stations will go live across Hammersmith and Fulham, Wandsworth, and Lambeth. Plus a few others in the existing area. Many new stations have already gone live in Kensington and Chelsea (among the latest are Phene Street, Clarendon Road, Lansdowne Road and St Mark's Road).

This is the most exciting expansion of the Boris bike scheme since the eastern extension in April 2012. It will make the London scheme one of the biggest in the world.

Serious questions are currently being asked about cycle safety in London. For the potential of these new bikes to be realised, much more needs to be done in providing space for cycling in London. But on Friday 13th, thousands more Londoners will have access to a cheap, healthy and convenient transport option. I hope many more will switch to cycling as a result.

Saturday 16 November 2013

More new docks go live in Kensington and Chelsea

K&C is the place to live if you're a Boris biker it seems. Addison Road and Princedale Road went online in September.

From this weekend you can dock in:

Danvers Street (on the riverside a little east of Battersea Bridge)
Thorndike Close (just off Finborough Road)
Evesham Street (n the very north-west of the borough)
All Saints Road (Portobello, just south of Westway)

We look forward to more soon.

Thursday 7 November 2013

Better Boris biking

City University students have presented their findings on improving Boris bikes, including integration with Oyster, upgraded docking stations, and better access to information. The article is worth reading, though several of the recommendations sound expensive. Vending machines for bike equipment sound positively impractical.

Last week we had the news that Boris bikes would be 'going electric', though the truth is not quite what the headline indicates. This would be a separate system for hiring electric bikes in north London, which would not be integrated with Barclays cycle hire. I wish the scheme good luck, as long as it doesn't draw funding away from the improvements and extensions which the Boris bike scheme still needs.

The extended Superhighway 2 has opened, prompting a flurry of new policy announcements from the Mayor. However, there are no docking stations along the new segregated section. A glimmer of light is that Boris has promised the existing section from Aldgate to Bow (where there is no shortage of Boris bikes) will be upgraded with better junctions and more segregation.

And back to the southwest extension, the first 14 docking stations in Hammersmith and Fulham are ready to go in December, it is reported.

Sunday 3 November 2013

Around the boroughs - Wandsworth

Story so far: Wandsworth is a blank canvass, having not been a location in the initial phase or the 2012 extension

Coming soon: 60 docking stations will cover the northern parts of the borough, extending the scheme out from Vauxhall in the east as far as Putney in the west. Highlights will include Battersea Power Station and Battersea Park. The largest dock will be at Clapham Junction. The Council has details of all the new docking stations on its website. Due to the expansion north of the river it will be possible to cross Chelsea, Prince Albert, Wandsworth and Putney bridges and find docks on the other shore. Wandsworth does not have fantastic streets for cycling (the south circular for example is pretty scary for anyone on a bike) but hopefully the arrival of Boris bikes will spur the development of new, safer routes.

The future? Cycle hire could be extended into the south of the borough in due course, and the major redevelopment of the Nine Elms area is an opportunity to develop high quality cycling facilities which link in with the extension of the Northern Line.

Boris rating: 5