Showing posts with label intensification. Show all posts
Showing posts with label intensification. Show all posts

Sunday, 6 October 2013

Around the boroughs - Southwark

In the next two weeks I'm going to review all the boroughs which are currently, or soon to be, involved with the cycle hire scheme. I'll be asking what's there, what's coming, and what's still needed.

There's no particular order, so today I'm starting with Southwark.

Story so far: of all the central London boroughs this has the least docking stations, and most are in the Borough/ Elephant/Bermondsey area. All are popular docks, Hop Exchange probably being the busiest owing to its location close to London Bridge station. Curlew Street in Shad Thames is the easternmost station south of the river.

Southwark site: new docks will soon be here on Snowfields
Coming soon: intensification in the current expansion is limited to 3 docking stations close to London Bridge. These are much needed. Wansey Street has been closed for several months due to the fire at the Cuming Museum, hopefully this too will reopen.

The future? Southwark is the ideal borough for future expansion. It is central, relatively flat, and has potentially good cycling routes. Peckham, Rotherhithe and Camberwell would all be popular for Boris bike locations in my opinion. Docking stations could be added along superhighways 5 and 7.

Boris rating (out of 10): 4

Thursday, 25 April 2013

Planning for new docks nearing completion

The Standard is running a quite silly article today.

The impression seems to be that hires are in decline, but if we look towards the end of the article, we notice that hires in the first two months of the year are up. And do you remember last March? It was the summer we never had, beautiful weather until the skies opened in April and, with a brief Olympic respite, continued all year. The contrast with freezing March 2013 couldn't be greater.

Over in the Times Matthew Parris has apparently complained he can't find anywhere to dock. I haven't read the article (I don't pay for the Times online) but is the fact that there are tidal flows of bikes during the day really big news? Sure we need more docks and better redistribution, but it was ever thus.

Another fun bit of news was that we might get bonuses for returning our bikes to an empty docking station. 'No immediate plans' is perhaps the take-home message of this article.

There is more concrete news though from the boroughs, where the long and largely unseen process of selecting and approving sites for new docking stations is underway for the southwesterly extension.

In Kensington and Chelsea, by my count 29 docking stations have been approved, with only 4 refused. In Wandsworth 57 have been approved, with only a few remaining to be determined, the most controversial being Lavender Gardens, on which my last post commented. Lambeth have approved most of their latest applications, 19 accepted, 1 refused. The loss of the site on Exton Street is regrettable, as the area around Waterloo is desperate for new docks. In Hammersmith and Fulham, 59 sites have approval, 3 were refused, and 27 are still pending.

It is disappointing that whereas the eastern extension also featured 'intensification' in the central area, this does not seem to be a feature this time. There are no new applications for sites in Westminster and the City.

Within a year all these new stations should be up and running. I imagine March 2014 will see quite a bounce back in hires from those the Standard reports today.

Saturday, 9 March 2013

Boris biking - a new dawn?

In the 4 months (!) since my last post, not a lot has changed. Slow and steady planning progress has been made towards the Western Extension; bad weather has reduced useage to a quarter of what it was at its Olympic peak; oh, and yes, the charges did go up. And then everything changed ...

See the Mayor's new vision for cycling here.

The obvious caveat is to wonder how much of this will actually come to fruition, but for now let's applaud the vision, and admit that the Mayor's vision for cycling has certainly changed from the rather impotent 'Cycling Revolution' we were initially promised. A good analysis of the new strategy is on the Cyclists in the City blog.

So let's think about what it promises on cycle hire - here's the text with my comments:

XII. Expanding and improving cycle hire

 We will extend Barclays Cycle Hire to many parts of Hammersmith & Fulham, Lambeth and
Wandsworth by the end of 2013. This represents a nearly 30 per cent rise in the size of the
scheme, to around 11,000 bikes.

No news here, this is already in planning. More likely early 2014 by the time all the docks are installed.

 Our new mainline terminus Cycle hub will have London’s largest docking station, with at least
several hundred bikes, at our new mainline terminus Cycle Superhub (see above), with very
good cycle routes linking from it. This and the wider bike parking at the Superhub will help
address unsatisfied commuter demand.

One assumes this will not be Waterloo which already has a superdock. Paddington maybe? Kings Cross / St Pancras would probably be my preferred option, though the Euston Road is a barrier to cycling. Victoria would be nice, but I don't think there's space. A consideraton here will be the massive new commuter flow set up - are there enough docks in central London to cope with the increased demand?

 We will expand popular docking stations, where space and planning allows, to reduce the
problem of empty and full docks. This will involve reducing the number of bikes at less wellused
docking stations.

That's fine - but why reduce the number of bikes at less popular stations? Just have more bikes overall surely?

 We will open (or move) docking stations along our Quietway and Central London Grid routes
(within or just beyond the existing footprint of the scheme) to drive usage of the new routes.

Perfectly sensible, though opening new stations is to be preferred. If, as I think, this strategy will significantly stimulate cycle use in central London, many more centrally located docks will be needed. Plus why abandon sites which are already installed and have planning permission?

 We will carry out incremental expansion of the footprint where there is strong demand.

This is quite nebulous - what is strong demand? And might this favour affluent neighburhoods rather than others, where community groups are vocal and well-organised. Indeed, might it depend on the particular whims of local authorities? I would prefer to see a more centrally-planned scheme for expansion which will eventually cover all of London.

 We will work with local authorities who wish to pay to extend the footprint such as to Kentish
Town.

See above - what if authorities don't want to pay? No-one should be denied the bikes simply due to local politics.

 To drive usage, we will encourage companies, universities, colleges and hotels to install new
docking stations on their premises, at their own expense, for the use of their staff, students
and guests.

This is brilliant, if it's carried out properly, and the docking stations are located in public areas. In fact, it's probably the best way of addressing the capacity issues in central London. I could imagine a large dock in the grounds of Imperial College, just to choose one example.

 For this, we will particularly target companies and universities with a number of separate
central London sites which are slightly too far apart to walk between, but slightly too close for
public transport to be convenient.

I'm not entirely sure how effective this will be, but I don't object.

 Given the heavy use of the scheme by tourists, we will develop and market Barclays Cycle Hire
tour routes, along quiet streets, which they can follow, with appropriate signage, printed
leaflets, website downloads and apps for their phones. This again will drive usage.

Great idea - though I also think docking stations need to be better sited for tourist useage. Docking stations for St Paul's and Westminster Abbey for example are hidden in side streets. And dare I mention the Mall??

 We will integrate cycle hire with the roll-out of contactless payments using credit, debit and
charge cards, to make it a fully joined-up part of the transport network.

No objection to that - shame the system can't accept Oyster

Overall, the opportunities for cycle hire within the strategy are somewhat more limited than the ambitious initial phases of the scheme. Yet .the network of safer routes should significantly stimulate demand for the bikes, which in itself will further the case for further expansion and intensification. Boris calls for cycling to be 'de-lycrafied' - what better way than through the bikes which bear his name?

Saturday, 11 February 2012

E-Day update

Yes, it's 8 March, according to TfL's press release, and reported by London 24 among others.

So a lot of work to get all those docks in within the next month! My guess is that, like the original scheme, not every dock will be in by 8 March and more will be constructed in the months to come. In the existing area, for example, intensification seems to be slow to get going.

So, look for me on 8 March cycling round the Isle of Dogs!

Saturday, 28 January 2012

Bikes to Wandsworth

Plans are advancing for 80 new docking stations in Wandsworth borough, it is reported.

Meanwhile docks are springing up all over the place in Tower Hamlets ahead of a switch on of the eastern extension probably in March. Docking stations are also under construction westwards through Holland Park towards Westfield, and north into Camden Town. 'Intensification' of the central zone is also promised, but only a modest number of new docks have appeared so far: Oval, Crinan Street and Killick Street are already active, Red Lion Street, Kennington Station and Grays Inn Road are installed but not yet operational - I'd be interested to hear if any others are under construction.